lateral-static-test-ability
August 23, 2018

1,000 kips of Lateral Static Load Test Ability

Simplicity and highly effective. AFT upgraded our lateral static load test capabilities with the addition of this 1,000 kip lateral test strut. Ideal for Drilled Shafts and Pile groups. Push or pull while allowing the pile head to freely rotate. Allows accurate back fitting of results to modeling programs. We apply fully automated precision electronic instrumentation above ground, embedment gages, and reusable downhole instruments for

static-load-testing-with-a-beautiful-backdrop
July 31, 2018

Static Load Testing with a Beautiful Backdrop

We appreciate the unique opportunities our clients give us. This time it was set in beautiful British Columbia, Canada. When the phone rang and we were asked if we could do a 3,000 kip top down load test, the answer was YES. AFT combined our static test equipment and know how with the resources of our client to successfully complete a series of complex high capacity

small-bore-big-results
August 31, 2017

Smallbore = Big Results with AFT-Cell

AFT recently achieved a load test record for the Tampa Bay Area. To maximize the side resistance that could be mobilized in a test shaft, we worked with our client Case Atlantic and the geotechnical engineer Terracon to design a test shaft with the optimal diameter to test capacity. The team finally decided on a 3 foot (~1 m) diameter shaft, 94 feet (28.6 m) below

north-american-record-drill-shaft
March 31, 2017

North American Record Drilled Shaft at 340 feet

AFT together with Malcolm Drilling Company has recently accomplished what has never been done in the USA. Drilled shafts were installed to an astounding depth of 340 feet (104 meters) and load tested with our AFT-Cell Bi-Directional Load Test system. Two levels of AFT-Cell assemblies with three cells per level were used to apply test loads in excess of 30,000 kips. The new Oceanwide Center project in

using-our-test-method-resources
March 31, 2016

Using our Test Method Resources

When unexpected challenges come up during production pile installation, AFT can put your mind at ease with our array of load testing methods offered. AFT uses our testing resources to develop the best solution for the client. For this site, we used two test methods simultaneously to expedite decision making and move the project schedule. AFT brought our static load test frame configured for tension

base-grouted-drilled-shafts-for-honolulu-light-rail-project
November 30, 2015

Base Grouted Drilled Shafts for Honolulu Light Rail Project

Honolulu, Hawaii –The Honolulu Light Rail Project project is taking impressive shape. Applied Foundation Testing is proud to be a part of this landmark structure on the island of Oahu, Hawaii, supported on our post grouted drilled shafts. Kiewit Infrastructure West Co. in conjunction with AFT used base grouting for the drilled shafts to reduce shaft length and increase constructability.  AFT is also performing CSL testing and